WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC

Answer Posted / deepak kumar

26.55d

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how i convert mm into standard wire guage (SWG)no.

2589


five benefits of using standard terminology in the measurement process

2854


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1576


In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?

1598


Explain what is Critical Path Method (C.P.M)?

664






show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1678


What is difference between engineering stress and true stress?

660


What is the difference between chamfer and fillet?

783


What are the uses of alloys in daily life and how are alloys made?

849


what is the theoritical percentage of concrete cubes testing per day?

4382


if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.

722


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1351


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

1678


What is command line?

682


contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?

1887