Answer Posted / udhaykumar
minimum size of beam is 0.3*0.3m.
minimum size of coloumn is 0.23*0.23m.
Is This Answer Correct ? | 19 Yes | 6 No |
Post New Answer View All Answers
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what are the proper pipes for salt water line
How can we demolish concrete beams?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
pls mail some more tecnical qustions at msaranya2610@gmail.com
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
How high should the water tank be to provide a 60 psi at base of this water tower?
what is cross hair cursor?
what is project?
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What are some facts about concrete?
Technical Question of Civil Engineering
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)