how much extra rod length should be provided for beam
Answer Posted / udhaykumar
Extra rod should be provided for beam in two section
(i.e) compression zone & Tension zone.*It depending on the size of beam*.
In compression zone , the extra rod should be provided on compression zone of the beam and extent up to one-third of beam's clear span both side of support....
In tension Zone, provide extra bottom bar in the middle of beam's bottom portion.
| Is This Answer Correct ? | 15 Yes | 4 No |
Post New Answer View All Answers
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is the difference between a wood shake and wood shingles?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is the best type of wood glue?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
what is hydrostatic paradox?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
residential projects,structural.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How do you measure water flowing through 300mm diameter pipes?
For what building Built-on balconies are preferable? What are the advantages?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx