Differenciate between One way slab and two way slab
Answer Posted / udhaykumar
Ly/Lx > 2 ,is called one way slab..
In the slab, bending moment is more in shorter span..so, main rod is provided in the shorter direction.....
Ly/Lx < 2 , is called two way slab.. In the slab bending moment is more in both directions... so, main rod is provided
in both direction..
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
Formula of area of crane hook
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
how to calculate MR 9(derivation)
What is missing report and how to prepare
what are the five benefits of using standard terminology in the measurement process?
what is the construction cost for per cft of multistorryed building in kolkata?
five benefits of using standard terminology in the measurement process
why the openings of sieves are square io size?
How many axes do cartesian coordinate system has?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
How to arrive d*d/162 , for finding the kg per meter , wt of steel
why do we provide haunches in rcc box or underpasses?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
How do you calculate reinforcement weight of steel?