best option for job
in construction
govt or pvt for engg
Answer Posted / rahul meena
pvt job is best for civil engg. , in govt no salary no
reputation
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
What are the common ways of demolition?
how can i calculate cement in brickwork
how to calculate the concrete mix m30 by volume
mix design procedure for 1:6 cement mortar
at which depth the construction of tunnel is economical from cost and engineering aspect.
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
What is the basic difference between OPC
What is meant by a context menu in a cad software?
what is the types of door's wood?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
How to calculate woden area in sft and Cft
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
What is Architect-Prepared Contract?