sir i have 2700sq.ft area.i wish to make a coomercial space
including this area.sir what could be the estimated cost of
3 story bulding in varanasi.
Answer Posted / mayank jain
this is not interview ques...
Rs. 1150 sq. feet for A class self constructed if contractor
then cost 1600/- sq. feet
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are the Task work of different labour.?
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What is the Roll of Water Bonding under VDF road?
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
Define What is Civil Engineering?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Specific gravity of cement?
Explain the mechanism of cavitations in pipes and drains?
What you understand by richter scale?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
can you provide a link for manual design of building?