sir i have 2700sq.ft area.i wish to make a coomercial space
including this area.sir what could be the estimated cost of
3 story bulding in varanasi.
Answer Posted / mayank jain
this is not interview ques...
Rs. 1150 sq. feet for A class self constructed if contractor
then cost 1600/- sq. feet
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How do You Maintain a structure after getting cube test of low strength.
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
What is the strength of 1:6:12 mix?
What are the strongest shapes in building?
how we can find sieve #4 is 4.75mm?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
how much need sand and cement for 1 cft roof construction?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
what is E
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
what is cement wastage percentage in NHAI ROAD WORKS
How to calculate woden area in sft and Cft
pls tell me about method of cutting length of ties column