how to calculate stair case landing slab bottom shuttering
marking,angle of stair case?
top landing length-1250mm
treads length-2700mm(9X300mm)
rise length-1500mm(10X150mm
top landing level +1.5m lvl
bottom level-0.00m lvl
Answer Posted / mayank jain
simple, not need to calculate angle , mark horizontal
distance and vertical ,meet the points........also use
AutoCAD drawing for this purpose
| Is This Answer Correct ? | 3 Yes | 4 No |
Post New Answer View All Answers
what is diversion?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how to find ssm in foundation?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
What is the Null Point of chimney in Power Plant
Define What is rigging?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
how to calculate reinforcment in staircase cranked beam?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Describe a time when you anticipated potential problems and developed Preventive measures