Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

advantage and dis adventagesof using crusher dust insted of
sand in rcc works

Answer Posted / guest

Advantages :-
1.Crusher dust is used primarily as filler and cement aggregate.
2. When used in concrete, the crusher dust mixes in with larger aggregate to help form a specific texture.
3.Crusher dust can be used for many of your compacting jobs around the home, such as: paths, carparks, under slabs, filling trenches, under water tanks, etc.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why Should Curing Not Be Done By Ponding And Polythene Sheets?

1277


Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?

2512


What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

2301


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1838


what is difference between GTS bench mark and temporary bench mark

5072


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

2190


The mixture of different ingredients of cement is burnt at?

1630


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

8449


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1965


What is the basic difference between OPC

2052


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

2452


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1954


Bernaullis theorem deals with the law of conservation of mass momentum energy none

2006


What is meant by autocad?

1212


what is idealized curve for concrere and steel

2330