Answer Posted / mounika
first think is the shorter span reinforced is easily distributed load on side (longer span)n its take less time to distributed load to sides....
longer span having the more moments so the shorter reinforced is distributed the load ...so it will safe
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the types of door's wood?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to shuttering is used in slab
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Which type of plywood & sizes using in construction projects ?
what is castigliano theaorem
3. What are the disadvantages of your present job, things you do not like about it?
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is meant by dimensioning?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
how u design STAGING for Superstructure in BRIDGE construction?
What is the density of DLC & PQC and how it is differ from normal concrete?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?