Answer Posted / neelam saroj
BBS = Bar Bending Schedule
uses:
1)provides details of Different Diameter of Steel.
2)Provide the Cutting Length
3)Details of Bar shape
4)Total LEngth
5)Weight of Bar
6)Total Qty of Steel used
7) BBS is used for Billing work
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
What are the steps involved in the concreting process?
Define What is passive earth pressure ?
What is the difference between linear dimension and aligned dimension?
3. What are the disadvantages of your present job, things you do not like about it?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
What is the usage of zoom command?
Will going from a 3-tap to 6-tap increase water pressure?
What are the different types of foundation?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
what is detail procedure of eccentric footing? plz. give solved exmple?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?