why main steel is to be reinforced in shorter direction in case of slab?

Answer Posted / smoib428

In rectangular beam,bending moment is more in shorter span so main steel is to be provided in shorter span`

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many shuttering material required for 1000 sq.m built up area.

1874


In cement concrete how to check a quality of material also proportion of material at site ?

1431


Mention what are the composition of a landfill?

724


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

668


What is the distance between railway tracks?

695






define the strength

1700


what is the meaning of 40/20 src

5760


Which are the Steel tests ?

737


Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?

1431


How many are the types of joints?

688


What applicable rate of wct in bihar

1388


what is the productivity in aluminium shuttering per day

1573


why we can use dust in concrete insted of fly ash

1697


What is the biggest dam in america?

661


is basic cost of the material includes tax?

1530