Answer Posted / carl_ellis
What is Foundation Fieldbus LAS?
Link Active Scheduler (LAS)
A Link Active Scheduler (LAS) is a deterministic,
centralized bus scheduler that maintains a list of
transmission times for all data buffers in all devices that
need to be cyclically transmitted. Only one Link Master
(LM) device on an H1 fieldbus Link can be functioning as
that link's LAS.
The Master and Primary Backup Link Active Scheduler (LAS)
shall reside in the host control system in redundant H1
network interface cards.
An additional backup LM Link Master (B/U LAS Link Active
Scheduler) shall be configured for all networks and shall
reside in the network device with the lowest field node
address. The Backup LAS should be placed in a separate
device that does not have controlling functions.
Primary and secondary interfaces should sit in separate
backplanes with separate CPUs, preferably in separate
control panels. Similarly, the primary and secondary power
supplies should not share the same backplane. Having
redundant interface cards, CPUs, and power supplies in the
same backplane is self-defeating since the backplane is a
single point of failure.
Each network shall be configured for automatic fail-over to
the Back-up LAS in the event of Master LAS failure.
Carl Ellis
Measure First
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Explain bernoulli’s theorem. State its application.
What is the advantage of using locally fabricated hook ups over Pre fabricated hook ups in process instrumentation?
In which principles tx ,pressure gauge,Temp gauge,control valve works?
Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..
god evening sir i am studying m.sc(tech)electronics &instrumention.am i elegible to all industies
I want measure the volumetric flow of gas in waste heat recovery Boiler?Tell me how and which type of instruments required. Plz mail me:naba02222@gmail.com Sam please post the answer .
How can we use feedback signal frm rtd for monitoring and in dcs for controlling ,then which type of rtd is sutaible 2 , 3,4wire and why ?
Draw a group of instruments interlocked to a Pump & Motor?
what is the process to make control schematic ?
how can leve transmetter calibate in feild .and also put cv and flow plz .....
if in a level tx height is given, how u calculate the ranges of the tx?
what is the reset offset and control system in instrumentation
How digital input and digital output 's are working in dcs
HOW CREATED LP & HP PRESURES IN DRUM FOR DRUM LEVEL MEASUREMENT!
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks