What is the difference between NP2 and NP3 Class RCC Hume
Pipes

Answer Posted / s k

NP-2 is collar joint & NP-3 is Rcc Ring with wicer joint

Is This Answer Correct ?    27 Yes 15 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate valuation for the old building?

1807


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

2582


Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

1935


What is packing Factor ?

992


Which ratio use for cement selery???

1387






How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

1730


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1334


how calucate cement sand ratio for plstering

1507


explain five benefits of using standard terminology in the measurement process?

1571


how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2405


what is project?

1918


What is the diff between cad & cadd?

651


What is difference between code and standard and specification?

1800


Explain the different types of roofing systems?

775


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2050