Answer Posted / md. nesar uddin (powerpac, ban
M.C.Q Means Multiple Choice Questions
| Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
what is the design procedure for building
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Why nautical mile is different from statute mile?
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
What is the difference between shear and tensile strength?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How can i do RCC rate analysis?
Describe the sections included in a typical bill of quantities
Mention different types of roof systems?
difference between fc and fc'?