WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1
M3,10M2,1 TON RESPECTIVELY

Answer Posted / siba sankar sahu

The permissible wastage percentage are
1. Cement - 3%
2.Sand - 7%
3. Steel - 5%
4. Tile 10%
5. Aggregates - 3%
6. Bricks - 5%
7. Blocks - 5%

Is This Answer Correct ?    40 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is moment-curvature relationship in semi rigid connections??

1637


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2727


For what building Built-on balconies are preferable? What are the advantages?

682


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

1925


Forces in a Shear Wall are in plane or out of plane ?

637






TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2061


What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?

1306


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1028


Why should you show Client/Engineer activities clearly on the project plan?

1919


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2362


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1460


calculate the quantity of water for 1:6 cement mortar

1617


How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?

1403


How much cement and water required for cement selery????

1399


What is the difference between Grade I, II and III of GSB?

1864