Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in my plant 100% feedwater control v/v is air to close but
due to instrument air fail,the valve opens but instead of
drum level high its get tripped in low low drum level.the
urv of level tx is 0 and lrv is -800.pls tell me the reason.
for such behaviour.

Answer Posted / carl_ellis

Air-to-close means that the valve fails open.

A boiler feedwater valve should 'fail open' so that the drum
level never drops too low, which can be an unsafe condition
and/or a damaging condition.

For that same reason, a boiler's feedwater valve should be
driven open on a low-low drum water alarm to prevent the
drum level from dropping too low and creating an unsafe
condition and/or a damaging condition.

Carl Ellis
Measure First

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is work 5/2 sov?

1861


Why upper weighing limit of electronics balance is 90% of the total weighing capacity?

2179


what is wave length were using ?

1879


What are different types of orifice plates? State their uses.

1134


the whole paper was based on Transducers..questions like define repeatability, error,accuracy,precision..den there were many q. on the conversion of Pa to mmHg and other units.. also..der wer few Q. on some level sensors(with diagram)

2049


Question on maha cement

723


please send the drdo exam paper

2371


diff between neutral ,ground,phase , earthing and shielding?

2275


why direct mounted pressure transmitters is always installed with DBB ( double bleed block) valve in process line or top of the tanks ?

2029


Actual using of tube bender to bend 2 opposite 90 deg at correct measurement center to center of tubing.

1877


Can anyone send most commonley asked Instrumentation questions and answers in cement industry please?

1974


How vortex sensor used for steam flow measurment can be checked on line i.e without taking out from process line.

2120


what about your moleg in pogrees with company

2259


please send me some question papers of HPCL aptitude test ?? please send it to bipinb.28@gmail.com ...

1955


what is use of communication wire in multipare cable(oil and gas field), why this communication wire not used in single pair cable?

2137