Answer Posted / yogesh jadhav
cover to slabs between 15-20mm or 25mm
beam side AND botttom 40mm
column side cover 40mm
footing bottom cover 75mm and footing top cover 50mm
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What applicable rate of wct in bihar
What is the name of this multiplication factors ?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
How to arrive dry volume of concrete (1.52 to 1.57) ?
what post do you prefer to work in this company and why do you think you can serve better in such position?
How to come 1.54 from dry to wet concrete?