what should be the quantity of water in m20 cocnrete /per
bag cement-- whats the formula
Answer Posted / kailash dangi
the watter is mix in cement weaght of 40%
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How to determine thee cut length for steel reinforcement bars in R.C.C design
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
How to calculate brick work quantity?? Block work quantity??
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why demand factor less then 1 ?
What are new methods /technologies of pothole patching?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
Explain what is zoning permit?
What in bending moment, if a moment is free end of cantilever beam?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
How can we convert weight batch to volume batch for m30 mix
For what purpose bedding is used under storm water drains, explain?
what is floating slab foundation?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx