How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / gulshan vashisht from hassanpu
brick = 476 (as pr calculation)
.3= dry volume of brick mortar
cement = .3*28.8/total of ratio(6)
= 1.44 begs in one cum
sand = .3*quantity of sand(5)/total of ratio
= .250 for one cum
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
How you can turn off the display for dimension in CAD?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
What is Critical path in Ms-Project ?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
What is the difference between a wood shake and wood shingles?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
2nd and 4rt angle elevation used in which country ?
How can you distinguish between sorption, absorption and adsorption?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
residential projects,structural.
400 ku d/c clearess ketan hota hai?
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
What is reinforced concrete?