what we do if excavation is more than actual requirement
Answer Posted / ssk
we r use plumb concrete 60% plums 40% m15 concrete
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.
how much one carpenter can doing shuttering of slab in one day
in the earthquqke the profile of water on dam is parabolic or not
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What is the use of extruded feature in solidsworks?
What is the use of extend command?
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
Design a rectangular channel.
mix design procedure for 1:6 cement mortar
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
What do you mean by tolerance factor of concrete ?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
Rate analysis of Vitrified tile in cement mortor 1:3
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
why building got air crack? if it get in one particular are what is means?