what we do if excavation is more than actual requirement

Answer Posted / ssk

we r use plumb concrete 60% plums 40% m15 concrete

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Calculate the maximum allowable speed on a horizontal curve of radius 350m if the maximum allowable values of the lateral coefficient of friction are 0.14 and the rate of superelevation is 0.08.

1932


how much one carpenter can doing shuttering of slab in one day

2878


in the earthquqke the profile of water on dam is parabolic or not

1455


i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like

1549


What is the use of extruded feature in solidsworks?

773






What is the use of extend command?

720


how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1531


Design a rectangular channel.

2456


mix design procedure for 1:6 cement mortar

1736


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

2127


What do you mean by tolerance factor of concrete ?

2669


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1228


Rate analysis of Vitrified tile in cement mortor 1:3

3935


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

2501


why building got air crack? if it get in one particular are what is means?

1949