Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / banambar pradhan
Dear all,
DURING THE PERIOD OF CONSTRUCTION TRAPIZODIAL COMES OVER THE
RECTANGULAR.
FORMULA IS-SQUARE+TRAPEZOIDAL
SQUARE =2X1.7=3.4XDEPTH 0.15=0.51 M3
TRAPEZOIDAL=H/6(A1+A2+4((A1+A2/2)^2))
SO=0.5/6(2^2+A2VALUE NOT GIVEN IN THIS QUESTION+4(2^2+A2
VALUE NOT GIVEN/2)^2))
IF A2 VALUE COULD HAVE GIVEN THEN WE CAN GET THE ANSWER EASILY
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the difference between undo & redo?
any book or article on pumped concrete.
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
What is costing in 100squre feet bricks
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Why Vitrified tile are getting pop up.
what mean By core Billing
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
how can we calculate steel value, depending on load
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What is alternate bid?
Did any of the egyptian pyramids ever fall down?
what is the difference between prime coat and tack coat in road construction
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?