what is v model

Answer Posted / balu kalkur

V(Varification and Validation model) model came up in order to overcome the drawback of waterfall model – here testing starts from the requirement stage itself.
The V & V model is shown in the figure in the next page.
1) In the first stage, the client send the CRS both to developers and testers. The developers translate the CRS to the SRS.
The testers do the following tests on CRS,
1. Review CRS
a. conflicts in the requirements
b. missing requirements
c. wrong requirements
2. Write Acceptance Test plan
3. Write Acceptance Test cases
The testing team reviews the CRS and identifies mistakes and defects and send it to the development team for correcting the bugs. The development updates the CRS and continues developing SRS simultaneously.
2 ) In the next stage, the SRS is sent to the testing team for review and the developers start building the HLD of the product. The testers do the following tests on SRS,
1. Review SRS against CRS
a. every CRS is converted to SRS
b. CRS not converted properly to SRS
2. Write System Test plan
3. Write System Test case
The testing team reviews every detail of the SRS if the CRS has been converted properly to SRS.
3 ) In the next stage, the developers start building the LLD of the product. The testers do the following tests on HLD,
1. Review HLD
2. Write Integration test plan
3. Write Integration test case
4 ) In the next stage, the developers start with the coding of the product. The testing team carries out the following tasks,
1. Review LLD
2. Write Functional test plan
3. Write Functional Test case
After coding, the developers themselves carry out unit testing or also known as white box testing. Here the developers check each and every line of code and if the code is correct. After white-box testing, the s/w product is sent to the testing team which tests the s/w product and carries out functional testing, integration testing, system testing and acceptance testing and finally deliver the product to the client.
How to handle requirement changes in V&V:-
Whenever there is change in requirement, the same procedure continues and the documents will be updated.
Advantages of V&V model
1) Testing starts in very early stages of product development which avoids downward flow of defects which in turn reduces lot of rework
2) Testing is involved in every stage of product development
3) Deliverables are parallel/simultaneous – as developers are building SRS, testers are testing CRS and also writing ATP and ATC and so on. Thus as the developers give the finished product to testing team, the testing team is ready with all the test plans and test cases and thus the project is completed fast.
4) Total investment is less – as there is no downward flow of defects. Thus there is less or no re-work
Drawbacks of V&V model
1) Initial investment is more – because right from the beginning testing team is needed
2) More documentation work – because of the test plans and test cases and all other documents
Applications of V&V model
We go for V&V model in the following cases,
1)for long term projects
2) for complex applications
3) when customer is expecting a very high quality product within stipulated time frame because every stage is tested and developers & testing team are working in parallel

Is This Answer Correct ?    35 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I studied MBA, I want learn any softwarecourse, which course is better hadoop or testing tools(manual+selenium?)

1206


where can i learn domain knowledge? how cab i gain domain knowledge? what types of Questions can be asked in domain(BFSI)? PLZ REPLY ME

1463


Scenario A year ago we developed a standards compliant website for a client. Their site is very popular resulting in the client wanting to be able to track how it is being used by their users. The first part of this project is to create a Login function so that users can be identified on the website. The data supplied by users would have to be handled securely. You have been allocated this project to work on. You will be responsible for the task from start to finish and will be expected to give feedback to your manager. User expectations  The client wants their users to be able to login using a page that fits in with the website design.  Tom wants to access the website but doesn’t want his login information to be available to anyone else.  Paul doesn’t want to login to the website because he’s not a frequent user. Task Please provide some feedback on how you would do the following:-  Being the only Test Engineer on this task, what would your approach be for this requirement?  Identify the key areas for testing this page.  What tools if any, would you use to perform the testing, bearing in mind that the testing will be done without using an ‘automated test tool’.  Provide a sample test case that could be used for testing this page, for example as a word or Excel document.

1454


what comments have u given in peer review? tell me at least 3 comments what u have given? july27 brahma412@yahoo.co.in

1510


Information about Automated Software Installer

1457






When to stop testing? (Or) how do you decide when you have tested enough?

643


What are the possible test scenarios around AVS check of any credit card? (Testing through payment gateway online) (What are the fields we should check while checking AVS and CVV)

1116


What is the difference between GUI Testing,UI testing and Usability TEsting

1947


Why Equivalence Partitioning is called equivalence or what is the significance of equivalence term in ECP?

1630


What is ofx testing?

771


Describe any bug you remember. Plz Give some real examples

1636


How do you determine user soad for a perf test of a Web application?

1875


Why should you care about objects and object-oriented testing?

1918


1)What are the QA procedures followed 2) Write test cases on a weatherreport.com web page that has only two dropdown and a submit button, Fist drop down is a countries and second is metros in the selcted countries.When proper selection si doen and submitted it shows weather report of that metro.? 3)Write test cases on Mobile Alarm Module? 4)Write test cases on Company Water Bottle?

2699


1.What is bidirectional traceability ??? and how it is implemented? 2.What is Automation Test frame work ? 3. Define the components present in test strategy? 4. Define the components present in test plan? 5. Have u written Test plan ?…. thank u!plz reply........

2250