Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the harm if we install primary side 11 KV VCB at a
distance of one Km from the 11/3.3KV 12.5 MVA transformer
through 11 KV cable.

Answer Posted / darklord

No immediate harm ,but during maintenance this 11kv line
between VCB and transformer need to be discharged with out fail,
Also during switching action their would be switching surge
created due to oscillating of wave between vcb and
transformer which will heat and may damage insulation of
transformer.

Their would also be control voltage drop for 1000mtr wire
which will have significant effect on protection of transformer.
but proper control strategies will sort this problem

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is meant by the phrase 'static load' in case of shorting in a generator excitation system?

2198


Is it possible to protect 3phase overload and earth fault of the 3phase system using two CT's.

2215


On what cycle does thermal power plant operate?

1212


i am an maintenance engineer. one distribution board have 5 feeder. recently its ELR trips frequently, but it take some times after trip( 10min,20min..)but 3 feeder no load. two feeder only loaded. i checked one feeder IR value all values are above 50Mohm.but B phase to Earth is only 9Mohm.any problem about low value

1995


it is in our knowledge tht right plug of supply of residential suppy system is phase n other is neutral...howevr the battery charger of mobile works in both ways...i mean it is not restricted in only one direction.ny of the holder of charger can hav phase .so y is it not lik tht phase of supply must b connected 2 phase of charger...?

2079


Why auxiliary transformers are not connected in parallel in primary stations?

1467


plz tell me,ht and lt panel terminals in substations explain beiefly

2980


What is Scheme Test of High Voltage Switchgear. Which tests it includes.

2469


main difference between ac and dc?

1746


If we use 250A MCCB as a incomer in Control panel for a fault level of 50kA for one second ,assuming temperature rise from 85 Deg. to 100 Deg , Then what will be the Aluminium Bus-bar size for 250A MCCB? Explain in detail.

2397


What is mean by STUB protection?

2128


what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero

2322


Is any AC drive(VFD) had a feature of DC injection braking? if available please mention the detail. i.e drive can supply braking torque when the motor in idle state.

2220


Why High voltage are generate noise ?

1580


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1842