Answer Posted / rahul
There is a difference
of size but the main
factor is of water
that we just
prepaired the bed
with best compected
NGL, cured with water
then we get down the
gsb on that bed, but
i think that we
easily make wmm with
out any water cured
but the NGL is in
better position.
| Is This Answer Correct ? | 4 Yes | 11 No |
Post New Answer View All Answers
How to determine spacing of bars in slabs or beams
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
How much does the leaning tower of pisa lean?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
how to calculate the scour depth
How can explode a block?
Define What does civil status mean?
Which tests are performed on soil to decide the type of foundation to be provided.
explain fie benefits of using standard terminology in the measurement process
what post do you prefer to work in this company and why do you think you can serve better in such position?
Define What glue is least sticky?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
how to calculate total cost for slab 35'×8'