Answer Posted / murzahir
To transfer the load carried by an existing foundation from the present bearing level to a new level at a lower depth.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
What are the uses of layer?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
Why are pull-out tests performed for soil nails?
Which is the direction for positive angle?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what is cement wastage percentage in NHAI ROAD WORKS
what is castigliano theaorem
At what point does a circle start losing area when being flattened?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is the difference between built area and super built up area?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
what is the meaning of 40/20 src
what is the maximum number of course that can be laid according to IS code and the max height.
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.