Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Dear friends, I have a question:
We work on a project which has some boilers to provide steam
for desalination unit.
The boiler area is safe and the only hazard source is the
fuel lines of boilers.
I want to know according to NFPA standard which type of
instrument should be selected on the fuel line: Eex Type or
Non-Eex type?

Thanks in advance

Answer Posted / carl_ellis

I totally disagree. Because NFPA 86 (2007) specifically
states that there is no need to impose requirements for
wiring methods appropriate for a hazardous (classified
area).

------- NFPA 86 (2007) ------------
A.4.1.3.3 Unless otherwise required by the local
environment, ovens and furnaces and the surrounding area
are not classified as a hazardous (classified) location.
The primary source of ignition associated with an oven
installation is the oven heating system or equipment or
materials heated. The presence of these ignition sources
precludes the need for imposing requirements for wiring
methods appropriate for a hazardous (classified) location.
Refer to Section 3.3 of NFPA497, Recommended Practice for
the Classification of Flammable Liquids, Gases, or Vapors
and of Hazardous (Classified) Locations for Electrical
Installations in Chemical Process Areas, and Section 3.3
------------ end ---------------

The 'gas train' or 'fuel train' is a pipe carrying fuel.
It is assumed that the fuel stays in the pipe until it gets
to the burner or is bypassed to an equally secure pilot
fuel line.

Control components in the pipeline typically need agency
approvals for conformance to failsafe conditions, but not
for explosion protection.

Carl Ellis
Measure First

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calibrate RC Feeder system in thermal power station?,If any instrument available to calibrate it,ple inform me. make:stock,

3185


The Design Calculation of Level Transmitter For Different Structure open & Closed Vessel, Eg. Diff. Level Tx., Capacitance For Continous Operation

2857


Explain the difference between mmwc and mmwg?

5670


what is the vital subject for scoring bhel exam&what is the question pattern

2408


Why mmwc unit is used?

1196


Sir , i have completed my M.Sc In Instrumentation and presently working in Maintenance department 3 yrs Exp , is there is any possible for work in offshore ..

1836


what is o2 analyzer and how it measured ,what is the role of this analyzer in cfbc boiler...

2011


how to calculate the total flow in square root

2405


What is exact difference between the panel earthing and system earthing in DCS system. What is the value of resistence.

2665


Valve positioner and actuators in detail.

1792


what is KV and XV valve

1796


Explain the working of an electronic level troll.

1096


what different types of problems do occur while doing instrumentation commisioning and how to solve them? please explain in detail

1754


what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.

2346


What are different types of orifice plates? State their uses.

1149