Difference between islanding and house load operation.
Answer Posted / l.sivagurunathan
in case of nuclear power plant due to grid disturbance like
under frequency condition, generator will feed power to one
or few parts of grid only which are predefined and remaining
part will be isolated from grid. this mode is islanding mode
whereas in houseloading mode generator will feed to its own
houseload only if grid is not further stabilised, that is
also for few minutes only till grid gets normaliesd and
restored. otherwise generator has to be manually
tripped.these arrangements are for baseload operating
generators only. because of these arrangements grid can be
restored easily
| Is This Answer Correct ? | 15 Yes | 3 No |
Post New Answer View All Answers
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
why airtel use + 24 volts and other operators use -48 volt
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
How to calculate power press toneage
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
Why superheated are started before I'd and rd fan?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
What is LB-SR.
our 125 kva DG does not start in AUTO mode works normally in MANUAL mode please give me a solution.....
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
LAPT working in alternator / generator
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
what does mean by kva rating