Answer Posted / fasil n.e.
stripping means removal of shuttering after concreting,
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
yasser arfatcompleted his degree in civil from which university
please briefly explain calculating or estimating steel quantity for a RCC column?
Explain the importance of moment of inertia?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
how many spacers we need for 1 ton reinforcement? aprox.
what is diffrence between catchment area,watershed and basin?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
150mm bricks size how many use 4.14 m3
Differentiate orthographic and isometric projections?
Scaffolding IS code NO.
what is civil engineer greatest strength and weakness?
Formula of mid span bar