Why we are not provide bar in the centre of the column and bar?
Answer Posted / abhinay
because the neutral axis beam and carrying any load
| Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
In reclamation works what are the importance of geotextiles and sand?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh
how to calculate steel for slab or footings?
what is tension footing?
How much 1 cum of M15, M20 & M25 concrete weigh?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
what is directivity effect?
what is the criteria for the finalisation of pavement thickness in road project?