what is superbuilt-up area in flats & how it is calculate?
Answer Posted / santosh
carpet area +33%add is super built up area
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the biggest dam in america?
What are the advantages of cad software’s?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
how clculate excavated or backfilling quantity by simpson's rule
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
At what point does a circle start losing area when being flattened?
how to calculate total cost for slab 35'×8'
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
what is idealized curve for concrere and steel
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?