What is tha cross secional area of cover block

Answer Posted / sjtbehera

for slab 325 sqmm
for beam -625 sqmm
for column- 1600 sqmm

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the strength of 1:6:12 mix?

3159


Which is the latest version of solidsworks?

1343


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2428


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2211


what is the 0 value in quantity surveying

2480


HOw much % of premium on DSR-2013 currently

2048


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

5529


please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.

2397


please send me bhel questions on rupesh.017@rediffmail.com

2797


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2241


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

2545


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2234


material used for mendrel use to bend epoxy coated rebar

2245


plz.show development and anchorage length in simple diagram.

2637


VAT and CST ? Which benefits for buyer ? Why benefits?

1902