Answer Posted / dibya ranjan pradhan
To increase the
compressive strength of
CONCRETE.
| Is This Answer Correct ? | 12 Yes | 3 No |
Post New Answer View All Answers
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
what"s the sort of beams?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Explain the latest method to detect a crack in a building?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
any book or article on pumped concrete.
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
How much cum. Brick work can do by 1 madon
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is the cost difference between site mix and ready mix concrete per cubic meter
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what is the code provision for acceptance of fineness modulus range for fine aggregates in design mix
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help