Answer Posted / anbu
PVC
CPVC
UPVC
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
What materials were used to build the golden gate bridge?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
may i know the detailed description of cutting length
Define Workability ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What do you mean by bond? What are the different types of bonds?
What is Critical path in Ms-Project ?
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
acceptance criteria for concrete works
What is the worlds largest concrete dam?
what is the clear cover for shearwall?
What is unit weight of normal concrete?
What is the l/d ratio of cantilever beam?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?