what we do if excavation is more than actual requirement
Answer Posted / sankardas banerjee
For secure a farmed base of the load bearing member by filling sand which is concentrated towards the compaction of base.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
howto calculate the quantities of material used in fly ash brick after finding the volume??
How do you determine specific gravity of cement?
What is a kip?
How to estabilish reinforcement Steel rolling margin for a building projects ?
Define What is an ice dam sock?
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
Define What are the uses of Groynes?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
brickwork labour rate per cum ?
Doul Bar reinforcement and details of drawing.
to minimize budget cost of building , what can i do
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How much cement,sand,bricks and water needed for 1square metre brick work?
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter