what we do if excavation is more than actual requirement
Answer Posted / sankardas banerjee
For secure a farmed base of the load bearing member by filling sand which is concentrated towards the compaction of base.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
please send me bhel questions on rupesh.017@rediffmail.com
Define What are the materials used in building a gravity dam?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
natucher of concrete &type of concrete?
How do we calculate the power of centrifugal pump?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
how to calculate MR 9(derivation)
Wat is meant by Aecron brick?
difference between fc and fc'?
What is need for setting limits?
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
cause of cylinder test failure