Answer Posted / anupam nath
Chemical reaction of cement and water will gives strength
to concrete. As soon as concrete placed in its place and
normal weather condition, during day time water percentage
in concrete evaporate and to retain the water in concrete
for at least seven days, we used to cure the structure by
sprinkling water on it.Curing starts after 24 hrs of
pouring.
Is This Answer Correct ? | 27 Yes | 2 No |
Post New Answer View All Answers
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
how do we design mix ratio?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
What is M40 _ TOR - EQ and B.F.S
At what point does a circle start losing area when being flattened?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
how to create our resume?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
what is the anchorage length of reinforcement.
How do You Maintain a structure after getting cube test of low strength.
How much cement will require for 1Rmt Skirting laying
what is the theoritical percentage of concrete cubes testing per day?