How many modular bricks are required for 1 cubic meter of
brick masonry?
Post New Answer View All Answers
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
In Rcc ratio calculation I wanted to know quantity of Steel also.
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
what is constat for brickwork
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
What is thumb rule in quality and quantity estimation of a Residential building??
What are the important hardware systems used for cad?
SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
explain what do you mean by the property development.
explain the rale of the government in the construction industry
how u design STAGING for Superstructure in BRIDGE construction?