1 cubic meter contains how many bricks

Answer Posted / santosh singh

hi,

friends you dont read books like B.N. DATTA OR CPWD
SPECIFICATIONS which states ie 1 cubic meter of brickwork
contains 500 bricks.please read. don't get confused.

1 cubic meter contains 500 bricks of size 20cm x 10cm x 10cm
this is standard.
which includes thickness of mortar ie. 10mm
(actual size of bricks is 19cmx9cmx9cm)

if size of brick varies then u can find it like this

no. of bricks = total volume of work/ volume of one brick

out total volume of brickwork 35% is volume/quantity of
mortar for 8 inch wall and for half brick wall volume of
mortar is 31.5 %.
ok

thank u .

Is This Answer Correct ?    29 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which purpose we use deck anchor in bridges?

632


how much cement and sand required for 1cum rr masonry

4521


what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?

1870


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2372


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

1553






Why nautical mile is different from statute mile?

723


Define What is the origin of name Railway Sleepers?

814


A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.

1829


howto calculate the quantities of material used in fly ash brick after finding the volume??

1165


std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30

1604


What is the per cu. mt. price of ready mix in Gujarat region.?

1781


5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?

8482


(Project Management Topic) What are the important criteria in the successful realization of the project?

1656


What is the best type of wood glue?

696


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2176