I. Policymaker
II. Technical specialist
III. Project manager
IV. Software development manager
The personnel listed above represent a partial list of
candidates for the configuration control board (CCB). In
addition to software QA and software CM, which of these
personnel should be included on the CCB?
1. II and IV
2. II
3. II and III
4. I and II
5. I, II, III, and IV
Answer Posted / karthik
3.II and III
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are test driver and test stub and why we need them?
Would we given training at first job (entry level)?
Questions for role of a QC engineer at NDS,Bangalore 1st round is written 20 questions on aptitude and 10 question on testing Aptitude--problems on time and distance,tap problem,ages,time and work,probability, Testing 1.Difference Between QA & QC 2.Any 4 types of SDLC models with diagram. Also Pros and cons of each model 3.What is application Testing And embedded testing 4.Qualities of a good tester 5.Test cases for registering user. One field for user name,2 fields for password,"ok" and "cancel" button 6.What is a bug,explain Bug life cycle 7.Difference between priority and severity? 8.Some question on software design
What is the need of test plan document?
What is bug?
What has not worked well in your previous QA experience and what would you change?
Can anyone please tell me how to export the requirements from QC 9.2 to excel file.
What is the difference between black box and white box testing?
Tell me some key points to consider while writing a bug report.
What is the strategy for automation test plan?
If there are more number of production defects, how will you tackle the team as a lead
What are the attributes of a good software qa engineer?
Give me an example of the best and worst experiences you've had with QA.
Automation testing regarding with qtp, explain the process of testiing the application with qtp????
What is a test strategy and what does it include?