what we do if excavation is more than actual requirement
Answer Posted / raj
if excavation is more than the actual requirement , then we have to use filling upto the level which we have to originally excavate . the filling maybe sand filling or pcc filling
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
What is the l/d ratio of cantilever beam?
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Define What is a kip?
Are you ready to relocate with your immediate family to United States as a new employee?
Define What is made from large rocks, which protects the base of cliffs?
residential projects,structural.
what r the precaution for high in atp tempareture,low in atp tempareture
How can you distinguish between sorption, absorption and adsorption?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
In reclamation works what are the importance of geotextiles and sand?
Which tests are performed on soil to decide the type of foundation to be provided.
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is soil enforcement?