what we do if excavation is more than actual requirement
Answer Posted / sjtbehera
Filiing excess earth and obtained required soil bearing capacity is very timespending.best is construct in to orginal level
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
plz.show development and anchorage length in simple diagram.
Describe a time when you anticipated potential problems and developed Preventive measures
what is the list of building construction equipment & teir output?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Soil bearing capacity formula
explain fie benefits of using standard terminology in the measurement process
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
why we use 19x9x9and 20x10x10 but not other
why +1 to be followed for calculating the no of bars in BBS. Please explain
Explain moment of inertia and its importance.
define the strength
i need gate exam civil engineering question papers with answers
Define block?
What are the different theories of failure under static load?