Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non
Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is
the Brick Size ?
1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non
Modular Brick. what is the Brick Size ?

Answer Posted / shinu

* Modular Brick Size - 200mm X 100mm X 100mm
* Non Modular Brick Size - 229mm X 114mm X 70 mm

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the Strength of brick?

1064


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

2698


what is the service corridor?

2368


what values & beliefs have guided you in your career path

3266


How to calculate volume of concrete & steel on tank foundation & ring wall ?

1564


Will going from a 3-tap to 6-tap increase water pressure?

1052


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1393


how to clculate the %of concrete strenght achive after curing?load

2416


What are the reasons for geotechnical site investigations in uganda?

1144


Test procedure of fly ash bricks as per code ?

2582


qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

2238


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

1791


Civil engineering related

1950


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1944


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

2061