what is purpose of using reactor in substations.
Answer Posted / r.mukesh
Shunt reactors are designed for connection to the ends of high voltage transmission lines or to
high-voltage cables for the purpose of controlling the line voltage by absorbing reactive power.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Thermal withstand capability under full short circuit conditions, in terms of number of times of occurrence of short circuit and corresponding anticipated percentage reduction in transformer life.
pls,send the previous year written test questions.
The slip during plugging operation is given by= A 1-s B 2+s C 1+s D 2-s
Basic motor transformer generator
What is the bundle conductor?
ACCORDING TO IEC WHAT SHOULD BE THE MINIMUM HEIGHT OF G.I. STRUCTURE OF CT, PT, ISOLATOR, LA?
it is in our knowledge tht right plug of supply of residential suppy system is phase n other is neutral...howevr the battery charger of mobile works in both ways...i mean it is not restricted in only one direction.ny of the holder of charger can hav phase .so y is it not lik tht phase of supply must b connected 2 phase of charger...?
sir i ve applied for hindustan petroleum and power grid india ltd..and the exams on feb 22.can you pls send model papers and tell how to prepare for those.i need to get into any of these for sure.....
Do you know what is dry-out test in x'mer
what is sevice settings for mccb?How can be it setted?
Practical condition in 400KV Sub station:- Breaker(open) , isolator(open), Earthing (close) at both end e.g A & B. Now Open A Stn Earthing than Open B stn Earthing (Which have a 50MVA reactor) , AND suddenly show R,Y,B phase 704KV,573KV,118KV respectively. Que is without closing of breaker how it is possible.???? My Whats app No:07621840498 for Further Discussion. Pls experts suggest.
Explain what is electric traction? Explain few advantages of electric traction system?
why magnetising curve not start with zero voltage?
What is a advantage of Self Reset Lockout ? On Fault breaker get trip & fault no longer exist then self reset lockout how inform us?
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?