What is the purpose of SOTF being used inspite of distance
Protection given?
Answer Posted / p anbarasu
During energisation of the line vt input is near to zero. at that time any fault happens in the line distance protection is not able to operate because vt is near to zero. So we are enabling the SOTF protection in the relay.
SOTF function: The relay will check if any fault happens during energisation with in the 20ms, if fault is presents the relay will operate as a simple O/C relay and its isolate the healthy section from faulty dection.
Current detection(A,B&C) and No Voltage detection(A,B&C)--> 20ms Delay ---> Trip
| Is This Answer Correct ? | 29 Yes | 7 No |
Post New Answer View All Answers
Lt motor sfu flashing reasons?
in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?
What is Scheme Test of High Voltage Switchgear. Which tests it includes.
What is pi controller?
How to control motor gearbox speed and friquency? If length of cable and dia given, how to measure the voltage drop?
How to check the thermocouple is correctly connected to cable for K type? (i,e positive pole is connected to non magnetic conductor and negative pole is connected to magnetic conductor)
Power Factor Correction Panel (Manual & Automatic)
I am an American living in Vietnam and I have recently gotten a refrigerator from Japan and it is rated for 100 vac, but the power here is 220 so I bought a voltage stabilizer it has a 1 kva output rating. Can you please tell me what the amperage is? I'm confused and without a working fridge.
who many types of fire explane with exmple
How to calculate approximate load loss of a distribution transformer by knowing %ge imp of transformer?
How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?
how to calculate micom relay earth falt time and current sertting
how to carried out DAR test in 11 KV Alternator ?
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
what is the responsibility of C license holder in industry?