Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is Well Point System in Dewatering

Answer Posted / devineni srinivasa rao

well point system water collect in special made pipes with vaccum pump .under ground seapage of water control due to bailout of water.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

trapozidal

2483


cement and sand required for one block of size 0.23*0.15*0.46

1824


how to calculate mivan shuttering matrial

1568


What is the meaning of a blue land surveyors flag?

1434


How much cum. Brick work can do by 1 madon

1653


What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?

1884


How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.

2302


though u r a civil engineer, y r u interested in tcs???

2575


What is the difference between Hinged and pinned in Column ends

5273


i want texture painting pwd data

2070


what is the function of GSB all class ?

1222


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

2424


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1978


satart to end steps by step process of building construction...? i want to planning theme accuretly

1950


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

2219