Answer Posted / sjtbehera
major benefit of auto level is level is done quickly
2. focus area is high.
3. if it is digital direct reading is possible
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
Why should pumping be not used in case of concreting works?
what is castigliano theaorem
give me the rate analysis for Bituminous Macadam and SDBC
Aptitude, reasoning, quants, verbal and technical question
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
how much tempareture are required to make liquid state of pid leed
Which is stronger solid steel rod or hollow steel pipe?
what is pile and deam foundation
what is the painting co efficient of slope roof tiles?
In case if concrete box girder bridges how is the number of cells determined?
What is Heavy Concrete & Normal Concrete