50D to 60D is the thumb rule for lap length, the lap length
depends upon grade of concrete and thickness of steel bars
| Is This Answer Correct ? | 18 Yes | 1 No |
Post New Answer View All Answers
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
what isload waring calculation
Rate analysis of Vitrified tile in cement mortor 1:3
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to calculate rate analysys of 1:6 plastering 10 sq m
what is idealized curve for concrere and steel
In block work seawalls what is the purpose of slip joints?
all technical question
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
For Wet Mix Mecadam design what is Optimum moisture content
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What Are The Steps Involved In The Concreting Process, Explain?
what is the mode of method of face bar measurement
what is tension column?
what is detail procedure of eccentric footing? plz. give solved exmple?