Answer Posted / guest
hide face come to omegle.
ful fill ur desires
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Explain major differences between routing maintenance and major maintenance.
how many shuttering material required for 1000 sq.m built up area.
punj loyed and sapurjl palanjl
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What is diversion tunnel in a dam?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Define What materials were used to build the Golden Gate Bridge?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Concrete cover for slab, column, beam and footing?
What are the different types of civil engineering?
What is the cemnent ratio
residential buildings,mixing of concrete,structural,construction material,site handling.
What is Rankine Cycle?