how find the cut length of tringular
ring and any formula find out the
quantity of circular brick work
Answer Posted / manish varma
1.assume the length of the three sides be a,b and c. so the total cutting length will be: a+b+c+6 times dia of steel.
as the bend at any point does not exceed 180 degree so we have to deduct 2d as same as 90 degree bend.
2. for circular brickwork centreline method will be the best one or we can take the length of the brickwork as the average of inner and outer length.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
What is the cost difference between site mix and ready mix concrete per cubic meter
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
what is that one cub metre plaster in cemant and fine sand
Define absolute co-ordinates?
natucher of concrete &type of concrete?
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
HOw much % of premium on DSR-2013 currently
what will be price of 1:2:4pcc per kg?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?