Answer Posted / imran
Suppose Area of slab is 100Sq ft = 9.3Sq.m
Suppose Dia 10mm at 125C/C Bothways r/f Provided,
For 1 Sq. m Area No Of Bars = 1/.125+1=9Nos
For boathways = 18Nos
Length Of 1Bar =1m,For 18 nos = 18 m
Now For 9.3Sq. m Area = 18Nos x 18 r.mtr. = 324 R.mtrs.
So Unit Wt of 10mm Dia steel =0.62 Kg/m
So for 324 r. mtrs steel =324*0.62=201.5Kg Steel reqd of 10mm dia.
| Is This Answer Correct ? | 23 Yes | 12 No |
Post New Answer View All Answers
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What is the origin of name railway sleepers?
Why the finite element method is lower bound solution?
What is the difference between tor steel and tmt steel?
what is the name of shuttering oil used in oman
Calculation of curtain wall of box culvert
What is difference between code and standard and specification?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
Volume of 25kg putty bag & 40 kg putty bag volume??
Why Vitrified tile are getting pop up.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
how to workable concrete cube test M-25 design mix
five requirements of infill panels for walls?
Write short note on construction programme for pile foundation.