Answer Posted / imran
i hv no time for understood u at now.
but simply we know that.
per sft =1.5kg ROD NEED
so,100sft=100X1.4=???
| Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
what is modular brick and it size
please briefly explain calculating or estimating steel quantity for a RCC column?
What is unit weight of normal concrete?
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
What are the advantages and disadvantages of using plastic and timber fenders?
What is the difference between Fe 500, Fe 500 D and Fe 515.
Define a polyline?
how to calculate valuation for the old building?
Which is stronger solid steel rod or hollow steel pipe?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
indian standard split spoon sampler
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
How many square meter can a worker/labor demolish a structure per day?
What is min thickness,min grade of conc & age of PQC ?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.